Hydroelectric Power Project, Peru

Tasks Performed: Consultant responsible for development of the conceptual and preliminary designs and construction cost estimate for a proposed 100 meter-high Roller Compacted Concrete (RCC) Dam. Comprehensive project evaluation including analysis of geological and geotechnical information!

Duration: 1999 – 2000 (6 months)

Description: Confidential!