Tasks Performed: Consulting Civil and Geotechnical Engineer responsible for providing technical assistance with the development of the main components of this 56 MW hydroelectric power facility. He was responsible for performing field engineering and geologic studies for the development of the design parameters; performed design reviews and cost studies for the dam, tunnels, and powerhouse; and conducted a seismotectonic study of the region to assess earthquake loading parameters. Additionally, he prepared the conceptual designs for a 35-meter-high and 300-meter-long roller compacted concrete (RCC) gravity dam.
Duration: 1995 (12 months)
Description: The project consisted of the design and construction of a 56 MW hydroelectric power facility located on the Citarum River in West Java, Indonesia.